Items where Author is "Adil, Mushlih"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

Adil, Mushlih (2023) Optimalisasi Biaya Dan Waktu Proyek Menggunakan Metode Crashing Dengan Penambahan Waktu Kerja Lembur Dan Sistem Kerja Shift : Pembangunan Gedung Kejaksaan Negeri Pontianak. Skripsi thesis, Universitas Tanjungpura.

This list was generated on Fri Apr 18 13:26:05 2025 WIB.